- Step 01DoneCreate workspace + invite a licensed reviewer
Register the firm, set the launch jurisdiction (FL, GA, or TX), and link at least one PE or SE so reports have a review path.
- Step 02DoneUpload a permit or capture an observation
Add an asset and capture your first structured observation — voice-first, photo, or manual entry. Permits attach to assets.
- Step 03PendingGenerate a review-ready report
Run synthesis against the controlled code catalog and route every significant finding to your engineer-of-record.
- Create your firmRegister your practice with state, license, and principal engineer.
- Invite a licensed reviewerAt least one PE/SE must be linked for report approval.
- Create your first assetAdd an asset with address, jurisdiction, and inspection category.
- Capture a field observationManual or voice capture with at least one photograph.
- Generate a report draftRun the synthesis pipeline and route to engineer review.
- Approve a reportLicensed engineer approves; report status advances to issued.
- Supabase configuredNEXT_PUBLIC_SUPABASE_URL + ANON_KEY present.
- Authenticated sessionVisit /auth to sign in.
- Firm membershipLoading firm memberships…
- Stripe checkout configuredNo NEXT_PUBLIC_STRIPE_PAYMENT_LINK_* vars — checkout CTAs hidden.
- Stripe webhook signed-event verifiedSignature path implemented; live signed-event roundtrip not yet attested. Set NEXT_PUBLIC_STRIPE_WEBHOOK_VERIFIED=true after a live test.
Meridian Structural Consultants
FL · FL-PE-58231 · Plan: pilot
- Bayside Tower — Condo MilestoneLourdes Caro · Association property manager · Bayside Tower COA2250 NE Ocean Blvd, Fort Lauderdale, FL
- Peachtree Logistics Hub — Roof AssessmentTrent Halverson · Facilities director · Peachtree Logistics Group1475 Industrial Pkwy SW, Atlanta, GA
- Gulf Coast Medical Parking DeckAdriana Velasquez · Risk & insurance lead · Gulf Coast Medical System900 Seawall Blvd, Galveston, TX
- Phase 1 — Q3 2026 pilotPDF / OCR Permit IntakeFrom permit packet to structured project record.
Ingests native and scanned permit PDFs, extracts a controlled set of fields, and routes them through reviewer accept before any live project is created.
Review gate: Extraction is presented as suggested field values. Human accept is required before a project or asset row is created from a permit document. - Phase 2 — Q4 2026 pilotPredictive Corrective Action LibraryLikely corrective-action patterns — for engineering review.
Ranked suggestions drawn from a reviewer-curated catalog of failure modes and historically-approved corrective-action patterns. A suggestion surface, not an engineering directive system.
Review gate: Never writes to a report section without a licensed engineer accept. Never emails contractors a corrective action. Displayed as: Suggested for engineering review — not an issued directive. - Phase 2 — Q4 2026 pilotContractor Portal with FBC Code Deep-LinksScoped portal with reviewer-curated code references.
Token-scoped portal that exposes a single project's reviewer-accepted findings to an assigned contractor, with deep-links into controlled Florida Building Code (and GA / TX) references.
Review gate: Contractors have read-only access to the exposed scope. Questions route back to the firm comment stream. No write access to the report, to code_references, or to any FCCIS record.
| Name | Jurisdiction | Category | Observations |
|---|---|---|---|
| Bayside Tower — Condo Milestone Fort Lauderdale, FL | FL | Milestone Inspection | 2 |
| Peachtree Logistics Hub — Roof Assessment Atlanta, GA | GA | Condition Assessment | 0 |
| Gulf Coast Medical Parking Deck Galveston, TX | TX | Windstorm Certification | 1 |
- significantSpalling at perimeter slab edge, Level 8Level 8, NE corner, grid B-4 to B-5 · source: manual6/7/2026
- moderateHairline crack pattern, south stair core wallSouth stair, Level 3, east face · source: voice capture6/7/2026
- moderateRoof drain ponding, southwest quadrantRoof level, SW quadrant near mechanical curb · source: manual6/9/2026